Unlimited Success Society
  • Business
  • Politics
  • Investing
  • World
  • Business
  • Politics
  • Investing
  • World

Unlimited Success Society

Investing

Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates

by admin July 26, 2025
July 26, 2025
Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates

Teck Resources (TSX:TECK.A,TSX:TECK.B,NYSE:TECK) has secured board approval for a multi-billion-dollar life extension of its Highland Valley copper mine in British Columbia, setting the stage for a two-decade boost in copper output.

The Vancouver-based miner said Thursday (July 24) that construction on the Highland Valley Copper Mine Life Extension Project (HVC MLE) will begin in August, following receipt of environmental and permitting approvals in June.

The newly sanctioned Highland Valley project is expected to extend the mine’s life from 2028 through 2046, with average annual copper production of 132,000 metric tons.

The company further confirmed that engineering progress is nearly 70 percent complete.

Over its lifespan, the project is expected to maintain approximately 1,500 direct jobs and US$500 million in annual GDP from current operations. During the construction phase alone, Teck said that it anticipates roughly 2,900 jobs and US$435 million in additional GDP.

“This extension of Canada’s largest copper mine, Highland Valley, is foundational to our strategy to double copper production,” said CEO Jonathan Price in the company’s announcement.

“The project will strengthen Canada’s critical minerals sector, generate new economic activity, and support the continuation of the jobs and community benefits that HVC generates for many more years to come,” Price added.

The announcement comes as Teck posted better-than-expected earnings for the second quarter. The company reported an adjusted profit of C$0.38 per share, beating the average analyst estimate of C$0.27.

The outperformance was largely attributed to stronger profitability from the company’s Trail operations, a major zinc and lead smelting complex also located in British Columbia.

Teck produced 109,100 metric tons of copper in the quarter ending June 30 but lowered its full-year copper production guidance to a range of 470,000 to 525,000 metric tons, down from earlier estimates.

While London Metal Exchange (LME) copper prices dipped 2 percent year-over-year to an average of US$4.32 per pound during the quarter, Teck could benefit from recent geopolitical developments that may tighten global copper supply.

US President Donald Trump’s planned 50 percent copper import tariff, set to take effect August 1, could push prices higher despite Teck’s minimal exposure to the US market, as most of the company’s copper exports go to Asia and Europe.

The company said that it expects the project’s total ore throughput to average 50 million metric tons annually, while total material moved will vary significantly depending on the phase.

Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

0
FacebookTwitterGoogle +Pinterest
previous post
Editor’s Picks: Miners Rescued, US Mine Waste Strategy, Ontario Expands CIMF

You may also like

S&P Global: Mining Sector Sees Mixed Q1, Next...

NorthStar Gaming Announces Receipt of Management Cease Trade...

Lithium Africa: Searching for Low-cost, Marquee Hardrock in...

Couloir Capital is Pleased to Announce It Has...

Rio Silver Receives Conditional Approval for Acquisition of...

Crypto Market Recap: $TRUMP Token Soars as President...

E-Power Starts the 2025 Exploration Campaign at Tetepisca

$2.6M Placement and SPP to fast-track China entry...

RUA GOLD Expands High-Grade Intercepts at Depth at...

Blue Lagoon Resources Strengthens Mining Committee

    Become a VIP member by signing up for our newsletter. Enjoy exclusive content, early access to sales, and special offers just for you! As a VIP, you'll receive personalized updates, loyalty rewards, and invitations to private events. Elevate your experience and join our exclusive community today!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Latest

    • NextSource Materials

    • Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates

    • Pinnacle Increases Non-Brokered Private Placement

    • Editor’s Picks: Miners Rescued, US Mine Waste Strategy, Ontario Expands CIMF

    • Top 5 Canadian Mining Stocks This Week: St. Augustine Gains 67 Percent

    Categories

    • Business (203)
    • Investing (546)
    • Politics (5)
    • World (565)
    • About us
    • Contacts
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 unlimitedsuccesssociety.com | All Rights Reserved


    Back To Top